Mumbai Metro Red Line (Line 7)
The Red Line (Line 7) of the Mumbai Metro runs between Dahisar (East) and Gundavali with 14 stations over about 16.5 km. A full journey takes about 28 minutes, and you can change to other lines at 1 interchange stations. It is operated by MMMOCL.
Stations, fares and timings checked against official data as of July 2026. Source: MMOPL, MMMOCL, MMRC, Navi Mumbai Metro. Timings can vary on weekends and holidays.
Stations
14
Length
16.5 km
End to end
~28 min
First / last train
5:50 AM / 11:00 PM
Red Line Route Map
See every line together on the full Mumbai Metro map.
Red Line (Line 7) Stations List
All 14 stations in order, with interchanges and the approximate travel time from Dahisar (East).
- 1Start
- 22 min
- 34 min
- 46 min
- 58 min
- 610 min
- 712 min
- 814 min
- 915 min
- 1017 min
- 1120 min
- 1222 min
- 1325 min
- 1428 min
Popular Red Line Routes
Red Line: Frequently Asked Questions
How many stations are there on the Mumbai Metro Red Line?
The Red Line (Line 7) has 14 stations, from Dahisar (East) to Gundavali, covering about 16.5 km.
What are the first and last stations of the Red Line?
The Red Line (Line 7) runs between Dahisar (East) and Gundavali.
What are the Mumbai Metro Red Line timings?
The first Red Line train leaves the terminal at about 5:50 AM and the last at about 11:00 PM on weekdays. Timings at other stations are later by their travel time from the terminal, and Sunday or holiday schedules can start later.
How long does it take to travel the full Red Line?
A full journey from Dahisar (East) to Gundavali takes about 28 minutes. The token fare is ₹30.
Which interchange stations are on the Red Line?
You can change lines at 1 stations: Dahisar (East) (Yellow Line (Line 2A), Red Line (Line 9, Phase 1)).
Other Mumbai Metro Lines
Plan a Journey on the Red Line
Get the fastest route, fare and interchanges between any two Mumbai Metro stations.
Open Route Finder